The NG-19RS Automatic Mattress Fold Rolling Machine is designed for high-efficiency mattress packing, combining folding, compressing, and roll-packing into a single streamlined process. To ensure maximum uptime and reduce unexpected breakdowns, factory operators must follow a structured maintenance routine and understand basic troubleshooting techniques.
In this guide, we outline the best practices to keep your NG-19RS operating smoothly and productively.
Clean machine surfaces: Remove dust, foam particles, and mattress fibers from folding arms, rollers, and conveyors.
Check pneumatic pressure: Ensure air supply is stable and within the recommended range (typically 0.6–0.8MPa).
Inspect safety sensors: Test emergency stops and photoelectric sensors for proper function.
Lubricate moving parts: Apply industrial grease to bearings, sliding rails, and chain drives.
Check belt and chain tension: Adjust if any loosening is detected.
Tighten bolts and screws: Especially around the folding mechanism and compression frame.
Even with regular maintenance, minor issues can arise during production. Below are the most common faults and how to handle them:
Cause: Misadjusted conveyor or sensor displacement
Solution: Reset conveyor alignment and recalibrate edge sensors via the HMI.
Cause: Air cylinder delay or limit switch malfunction
Solution: Check the solenoid valve and clean or replace the limit switch.
Cause: Incorrect roller pressure or speed setting
Solution: Adjust roller speed and pressure in the control panel settings.
Cause: Power fluctuation or HMI software crash
Solution: Restart the HMI; if unresolved, check the power supply and cable connections.
To reduce downtime during repairs, keep the following NG-19RS spare parts in stock:
Photoelectric sensors
Pneumatic valves and seals
Roller belts
PLC touchscreen module
Air filter regulator
If your team cannot resolve the issue quickly, NAIGU provides:
Remote video diagnosis
Spare parts delivery within 48 hours internationally
On-site engineer service upon request (available in select countries)
Keep a record of:
Machine serial number
Error code or fault history
Maintenance log
This will speed up support response and troubleshooting accuracy.
Train operators regularly using official NAIGU training manuals and videos.
Avoid overloading mattresses beyond the machine’s designed size/thickness range.
Perform monthly software backups of the PLC settings.
📞 Need expert help?
Contact NAIGU for technical support, spare parts, or remote assistance today.
📧 Email: jenney@gdnaimei.com
📱 WhatsApp/Phone: +86 13924835577
🌐 Website: https://naigumattressmachine.com